(335) CPF Superintendent job in Algeria
We are an international general contractor, engaging in the engineering, design and construction of various types of industrial facilities for a broad spectrum of customers throughout the world, including many of the principal national oil companies as well as several multinational companies. We are the leader for engineering and construction in the oil and gas sector in Spain, one of the leaders in Europe in the design and construction of oil and gas facilities, and one of the world leaders in the refining sector. Most of our business is concentrated on large turnkey industrial projects, although we also provide engineering, management, start-up and operating services for industrial plants. We are looking for a CPF Superintendent with 10-15 years experience in Oil&Gas Industry as Superintendent to join our project in Adrar, Algeria. French is mandatory for this position Reporting to the Site Construction Manager, he will be responsible for the following tasks: Leading the work in accordance with the pre-set programs and budgets for all Subcontractors and assume all responsibility regarding the construction operations in the absence of the Construction Manager. Co-ordinate and control all assembly phases and ensures full compliance with the construction program by the subcontractors. Revise all the programs with the corresponding supervisors and the Planning Engineer in order to analyse the progress of the Construction. Responsible for the establishment of good public and internal relations among the personnel in his team and for suitable discipline and motivation. Responsible for complying with and ensuring compliance with the Rules and Regulations concerning Safety, Health and Environment on site. Responsible for maintaining suitable personnel levels both in number and quality. Responsible with the Quality Control manager for compliance with the Quality Assurance Plan of the project. Ensure that the construction is carried out in accordance with the specifications and engineering plans. The full development plan is based on the construction of a Central Processing Facility (CPF) covering 80Ha that will sweet incoming gas from all the gatherings. Sale gas will be exported via a spur pipeline to a new 48” pipeline (GR5) to route it to Hassi R’Mel. Condensates shall be exported via trucks to the closest potential entry point of the Algerian transport network for oil sales. Total investment on the facilities is expected to be close to 2,000 MM USD. The site is located about 70 km from Adrar, the South Western part of Algeria, in an exploitation permit area, located at about 1450 km South-West of Algiers. Estimated Duration: 24 months General Conditions: - Rotation: 10 weeks on/2 weeks off - accommodation in campsite (single status) - Work schedule: Sat to Thu 60h/week